About Us

02Milestones

From the first foundation laid in Konya to today: 45 years of milestones.

198101Beginning

Founded

We were founded in Konya with a small engineering team. In the early years we built up our field experience with housing and small-scale commercial buildings.

  • First team
  • Konya
199502Fabrication

Steel fabrication workshop

We set up our own steel construction workshop and brought fabrication in-house. From then on we managed design, production and assembly from a single source.

  • Our own workshop
  • Production + assembly
200403Public

First public tender

We stepped into contracting with public building projects. With schools, service buildings and social facilities we became a trusted solution partner.

  • Public buildings
  • Contracting
201204Headquarters

Lacivert 1 Industrial Estate

We built our headquarters in Karatay and the Lacivert 1 Industrial Estate, bringing our office, workshop and warehouses together in one place.

  • Head office
  • Industrial estate
202205Growth

50th project

From industrial plants to public buildings, housing and steel structures, we have delivered more than 50 projects and built many facilities in Konya’s industrial zones.

  • 50+ projects
  • 69+ references
202606New era

Lacivert Park

With Lacivert Park we entered a new era in residential projects, building modern and safe living spaces in Karatay.

  • Residential project
  • On site
01 Mission02 Vision
03Mission & Vision
Mission

To approach every project with first-day care and give industry and society buildings that last a lifetime.

By managing the whole process from design to turnkey delivery under one roof, we offer our clients the right solution in terms of time and cost. We combine engineering discipline with 45 years of experience on site to produce safe, high-quality buildings that respect people, the environment and nature. We stand behind every building we deliver and build long-lasting relationships of trust with our partners.

  • Engineering first, then construction
  • Uncompromising safety and quality
  • Regular reporting, transparent process
Vision

To be the first solution partner that comes to mind for industrial buildings, from Konya to all of Türkiye.

We aim to grow our expertise in steel construction and industrial facilities with new technologies and a sustainable approach to building. We want to strengthen our own fabrication capacity to deliver larger projects with the same care, and to create neighbourhoods that raise the quality of life with our housing projects. We are laying solid foundations today for the cities of tomorrow.

  • Sustainable, energy-efficient buildings
  • Digital project and site management
  • From regional leadership to national scale
04Our Values

Four principles that keep the building standing.

We work to the same standard on every project: engineering first, then construction. We stand behind every building we deliver.

Unchanged for 45 years, these principles guide every decision our team makes, from the first site survey to turnkey delivery.

Engineering first

We complete the architectural, structural and MEP designs in full before going on site. We solve problems at the drawing board and avoid losing time and money in the field.

Quality and safety

We check every stage from material selection to assembly and document the quality. The safety of everyone on site comes before both the schedule and the budget.

On-time delivery

Because we fabricate steel members in our own workshop, we keep supply delays to a minimum. We deliver in full, on the date we promised.

Respect for nature

With energy-efficient solutions, the right materials and long-lasting details, we design buildings that leave the smallest footprint. While building today, we think of tomorrow.

05How We Work

From design to turnkey delivery in five steps.

From the first meeting to handover day, we run a transparent, well-planned process. You know in advance what happens at every step.

  1. 1–2 weeks
    01
    Step 01

    Survey and needs analysis

    We inspect your site in person and clarify the intended use, capacity needs and budget together with you. After the soil survey and preliminary feasibility study, we prepare a roadmap covering the project’s scope, schedule and cost framework.

  2. 2–6 weeks
    02
    Step 02

    Design

    We prepare the architectural, structural, mechanical and electrical designs at the same table, fully coordinated with each other. We follow the permit and licence processes with the municipality and other authorities on your behalf, and go on site with a complete set of drawings.

  3. Per project
    03
    Step 03

    Steel fabrication

    Structural members are fabricated in our own workshop to the approved design with millimetre precision. After welding, painting and dimensional checks, the parts are numbered and shipped to site ready for assembly.

  4. On schedule
    04
    Step 04

    Site works

    Everything from foundations and infrastructure to steel erection, roofing, facades and finishing works is carried out on the planned schedule. Occupational safety rules are strictly followed on site, and progress is reported to you regularly.

  5. Handover day
    05
    Step 05

    Turnkey delivery

    Once all tests and inspections are complete, the building is handed over ready for use, together with as-built drawings, documents and warranties. We continue to stand behind your building after handover.

06Contact Us

Let’s plan your next building together.

Whether your project is still an idea or your plot is ready, our team will listen to your needs and draw up the right roadmap for you.

Aerial view of the industrial zone where Lacivert Yapı’s head office is located
Head office Lacivert 1 Industrial Estate Fevziçakmak Mah. 10762 Sok. No:3 Karatay / Konya
Directions